Editing Camp Buildings
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 330: | Line 330: | ||
|- | |- | ||
! Construction Cost | ! Construction Cost | ||
|align = "right"| $ | |align = "right"| $????? | ||
|- | |- | ||
! Maintenance Cost | ! Maintenance Cost | ||
|align = "right"| $ | |align = "right"| $???? per week | ||
|- | |- | ||
! Construction Time | ! Construction Time | ||
Line 339: | Line 339: | ||
|- | |- | ||
! Weekly Upkeep Cost (based on 100% activity) | ! Weekly Upkeep Cost (based on 100% activity) | ||
|align = "right"| | |align = "right"| ???? | ||
|- | |- | ||
!colspan = "3"| Construction Materials | !colspan = "3"| Construction Materials |